Izaro APS - ERP
Advanced Production Planning

Gantt Chart of Resources and POs | Load charts | Heuristic algorithms

scroll

SEQUENCES PRODUCTION OPERATIONS BY MANAGING THE PRODUCTION PROCESS WITH ALL OF ITS RESTRICTIONS, TO MEET DEADLINES WITH THE LOWEST POSSIBLE STOCK

BENEFITS

  • Improved productivity
  • Reduces stock and investment in work-in-progress
  • Reduces delivery times, lead times and delays
  • Gives you a reliable delivery date
  • Minimises manufacturing costs
  • Maximises the turnover for a period
  • Manufacture based on options that can be configured by the company
  • Improves coordination between the Production, Purchasing and Commercial departments
  • Maximises profits
  • Adjusts the purchasing times of raw material to meet actual needs
  • Reduces overtime costs
  • Know what will be delivered late in advance to coordinate with the customer
  • Gives you flexibility to adapt to changes in demand
  • Allows you to quickly reschedule production in the event of internal problems (machine failure, raw materials not available etc.)
  • Allows you to plan advance improvement and maintenance activities during periods of low activity, without affecting production
  • Planning of different scheduling scenarios so that the best can be chosen at any given time

FEATURES

  • Sequencing algorithm and multi-criteria optimisation
  • Gantt chart of resources
  • Gantt chart of sub-resources
  • Gantt chart of production orders
  • Load level chart
  • Material availability control
  • Alternative resources (machines)
  • Batch resources (ovens)
  • Tunnel resources (belts, paint etc.)
  • Sub-resources (moulds, tools, workers etc.)
  • Control panel (result indicators and comparison between schedules)
  • Change time matrix
  • Energy efficiency matrix
  • Multiple characteristics (colours, sizes etc.)
  • Manual movements to set operations
  • Customisable calendars
  • Maintenance and zero capacity downtime
  • Resources with finite/infinite capacities
  • Overlaps between operations (flow, one piece flow)
  • Multiple environments (a plant, a section, a business unit etc.)
  • Multiple sessions (different schedules in an environment, “what if” tests)
  • Homogeneous work centres
  • Maximum and minimum waiting times
  • Order preferences by characteristic (e.g. paint from dark to light)
  • Division of operations
  • Priority between POs
  • Creation of customised events
  • Search for POs and orders
  • Result viewer for commercial, management and purchasing departments.

DISCOVER

TEST: HOW DO YOU PLAN PRODUCTION?

With this brief questionnaire you shall know how you plan production and you may think about it.

*The content attached you will be receiving is available in Spanish.

 He leído y acepto la política de privacidad y el aviso legal.

SECTORS WHERE IT IS USED

Sector Fabricación discreta

Discrete manufacturing

Sector alimentación

Food

Sector Gran consumo

Consumer Packaged Goods

SUCCESS STORIES

Alga industriasAlga industrias
UbisUbis
SilamSilam
RPKRPK
ZorrotzZorrotz
AsplaAspla